Bainbridge determined that Structure needed new spar deck planking and beams, masts, sails, and rigging, together with alternative of her copper base. Nevertheless, personnel and supplies were getting diverted to the Great Lakes, producing shortages that retained her in Boston intermittently with her sister ships Chesapeake, Congress, and President